A foundry casting cost calculation starts with the full cost of a production batch and divides that amount by the castings accepted for shipment. Track metal yield separately from the share of castings that pass inspection. One measures how much poured metal becomes castings, while the other tells you how many units can absorb the batch cost.
Two measures to record before calculating the cost
- Gross casting metal yield: gross as-cast part weight divided by poured metal weight, using the same batch boundary for both figures. In this example the numerator includes rejects before inspection.
- Final acceptance rate: accepted castings divided by castings poured. State whether the accepted count includes parts approved after rework.
For 100 castings weighing 140 kg before inspection, poured from 220 kg of metal, gross casting metal yield is 63.6%. If 95 castings are ultimately accepted, final acceptance is 95%. Keep both measures so a yield problem does not get lost in a quality report.
Worked example: cost per accepted casting
These figures are hypothetical and use one production batch. The metal charge and recoverable credit use a consistent valuation basis.
| Batch cost component | Illustrative amount |
|---|---|
| Metal charged to the batch | ₹15,400 |
| Moulding, melting energy, labour and finishing | ₹6,100 |
| Inspection and allocated shop overhead | ₹3,000 |
| Recoverable metal credit | −₹1,800 |
| Net batch cost | ₹22,700 |
At 95 accepted units, the cost is ₹238.95 each. If only 90 units pass and the net batch cost is held constant for comparison, it rises to ₹252.22 each. Actual net cost may also change when there is extra rework or a different quantity of recoverable metal.
What to capture in your foundry ERP
- Record the part revision, alloy, batch or heat reference, poured weight and gross cast weight.
- Post the number poured, accepted, reworked and rejected. Track acceptance after rework without counting the same casting twice.
- Separate returnable metal from unrecoverable losses and apply your normal valuation policy once. Keep rework labour and finishing visible by operation.
- Keep batch production cost separate from commercial quote inputs such as packaging, freight, one-time tooling, taxes and margin. Allocate each cost at a documented stage.
The American Foundry Society’s casting cost estimating course covers why estimates vary across foundries. For recent context on linking production records across foundry operations, see this 2026 review in the International Journal of Metalcasting.
Compare the example with your own batch data using the foundry scrap tracking guide. Explore Velotech Foundry ERP and costing software for the production and quotation workflows.